According to the customer, the system has two Transformers, one D.G. and one Bus coupler. These all should be operated automatically after the main failure.
The system should be controlled and monitored by operator using SCADA.
The operator should be able to operate all the Motorized Breakers individually, whenever required.
The parameters of all the eight energy meters should be displayed on the SCADA screens.